Remodeled Portland-style kitchen connected to a living area

Home Remodeling Services in Portland, OR

Make the home you already like work better for how you live today.

Cramped kitchens, hard-to-use bathrooms, unfinished basements, and disconnected layouts affect how your home works. PNW provides kitchen, bathroom, basement, and whole-house remodeling focused on function, flow, and the way each space is actually used.

Portland-BasedEPA Lead-SafeLicensed & InsuredReconstruction Experience

You Can Like Your Home and Still Be Tired of How It Works.

Most remodels start with something that keeps getting in the way of everyday life.

Cramped kitchen with limited counters and a narrow walkway

The kitchen feels cramped.

Not enough useful storage. Counters that fill up quickly. A layout that makes people squeeze past each other.

Dated bathroom with a tight layout and limited storage

The bathroom takes more effort than it should.

A cramped shower, awkward tub, poor storage, dated surfaces, or a layout that no longer works well for the people using it.

Dark unfinished basement with exposed ceiling framing

The basement is square footage you cannot really use.

It may be unfinished, dark, uncomfortable, damp, or simply not a space anyone wants to spend time in.

Older home interior with disconnected flooring and room finishes

The whole house feels pieced together.

Different rooms were updated at different times. Flooring, finishes, and layouts no longer connect, and the house no longer fits the way you live.

Remodeling gives you a chance to fix these problems instead of simply replacing what is already there.

Call Now: (971) 247-3661

Remodeling Services Built For What You Need

Whether you are updating one problem area or planning changes throughout the home, start with the project that matters most to you.

Finished kitchen with an island and practical storage

Kitchen Remodeling

Make the kitchen easier to cook in, move through, and live with.

Improve the layout, usable storage, work surfaces, cabinetry, lighting, flooring, finishes, and how the kitchen connects with the rooms around it. The goal is not simply a newer kitchen. It is a kitchen that works better every day.

Finished bathroom with an accessible shower and open floor area

Bathroom Remodeling

Create a bathroom that is easier to use and live with.

Update an outdated bath, rethink an awkward layout, improve shower or tub access, add useful storage, or replace finishes that are worn and difficult to maintain. Because bathrooms combine water, ventilation, and finished surfaces in a small area, what is underneath those finishes matters too.

Finished basement arranged as a family room

Basement Remodeling

Turn unused lower-level space into part of the home again.

Create a family room, office, recreation area, guest space, storage, or flexible living area from square footage that is currently going unused. Before new walls and flooring go in, the basement's moisture history and existing conditions should also be understood.

Cohesive whole-house interior in a Portland craftsman home

Whole-House Remodeling

Bring the whole house together with one plan.

Whole-house remodeling makes sense when several rooms need work, the layout no longer fits the household, or years of separate updates have left the home feeling pieced together. Plan the connected spaces together instead of treating every room as another separate project.

Remodeling Results: See the Difference

See how PNW turns outdated, damaged, or underused spaces into finished rooms built to work better.

Kitchen

Before

Dated kitchen before remodeling

After

The same kitchen layout after remodeling
Bathroom

Before

Dated bathroom before remodeling

After

The same bathroom after remodeling
Basement

Before

Unfinished basement before remodeling

After

The same basement after remodeling
Whole House Remodeling

Before

Dated living room before remodeling

After

The same living room after remodeling

Condition Check First

Know What You’re Building Over Before the Remodel Moves Forward

Portland has a substantial older housing stock. More than half of the city's housing was built before 1960, and roughly one-third was built before 1940. That does not mean every older home has a problem. But remodeling can expose conditions that were impossible to see while the room was still intact.

Has this area been wet before?

Past leaks, damp materials, basement moisture, or previous water damage should be understood before new walls, cabinets, or flooring cover the area.

What work has already been done here?

Older homes often have layers of previous repairs and remodeling. Once finishes come out, earlier work can affect what needs to happen next.

Is this a pre-1978 home?

Remodeling that disturbs painted surfaces in pre-1978 homes can fall under federal lead-safe requirements. PNW Restoration is EPA Lead-Safe certified. And we already work with moisture, damaged materials, hidden conditions, and reconstruction through our restoration services.

Before investing in new finishes, understand what the remodel is being built over.

Open walls and exposed framing in an older Portland home during careful remodeling

Plan Around Real Life

What Do You Want to Change, Keep, or Improve?

A remodel becomes easier to plan when you start with the problem instead of the trend.

Pull-out pantry storage in a remodeled kitchen

Kitchen Remodeling

“We need more storage.”

That could mean smarter kitchen cabinetry, a pantry that actually holds what you buy, and making unused lower-level space useful without simply adding more cabinets.

Compact bathroom with efficient fixture placement

Bathroom Remodeling

“This room feels too tight.”

A cramped bathroom may need better fixture placement, improved storage, or a layout that makes the room easier to move through and use.

Finished basement combining an office and family area

Basement Remodeling

“We need more usable space.”

An unfinished or underused basement can become a family room, office, guest area, recreation space, or another part of the home you actually use.

Older Portland craftsman home with original character

Whole-House Remodeling

“We like the character of the house.”

Updating an older home does not have to mean removing what gives it character. A larger remodeling plan can improve functionality while maintaining the details worth preserving.

Connected kitchen and living room with cohesive finishes

Whole-House Remodeling

“We are tired of remodeling one room at a time.”

When several rooms affect one another, planning them together can create better flow and avoid another series of disconnected updates.

Start with what matters most. Then choose the remodeling approach that supports it. 

Remodeling That Works for Your Home and Your Plans

We work with homeowners and property owners across the Portland area on remodeling projects for:

Portland single-family craftsman home

Single-Family Homes

Improve the rooms, layout, and everyday function of the home you plan to keep living in.

Condo interior overlooking Portland

Condos & Townhomes

Get more function from the space you have without making the remodel feel oversized for the property.

Portland duplex with two separate entrances

Duplexes & Multi-Unit Homes

Improve one unit or coordinate updates across multiple living spaces within the same property.

Practical updated rental apartment interior

Apartments & Rental Units

Replace worn or outdated interiors with spaces that are easier to maintain and better suited for tenants.

Compact secondary living space with a loft

ADUs & Secondary Living Spaces

Turn compact or separate living areas into more useful, comfortable spaces for guests, family, or everyday use.

Updated interior of an older Portland-area home

Older Portland-Area Homes

Modernize function and finishes without automatically stripping away the character that makes the home worth keeping.

Have a specific property type or a special remodeling request?

Call PNW. We’ll help you understand what may be possible and what the project would need before you move forward.

Call Now: (971) 247-3661

Our 8-Step Remodeling Process

We move the project forward in a planned order, checking the work that will be hidden before walls, flooring, cabinets, or finishes cover it.

  1. Remodeler walking through and assessing an existing home interior

    1. We Walk the Space

    We start with what is not working, what you want to change, and how the finished space needs to function. We measure the area and review the existing layout, adjoining rooms, access, and anything the remodel may affect.

  2. Remodeler checking exposed framing and subfloor conditions

    2. Check Existing Conditions

    Look for visible moisture concerns, previous repairs, damaged or uneven surfaces, and other conditions that could affect the work. For pre-1978 homes, we also account for applicable lead-safe requirements when painted surfaces will be disturbed.

  3. Remodeling plans and material scope being reviewed before construction

    3. Set the Scope

    Work through the layout, materials, fixtures, finishes, affected systems, and construction requirements before demolition begins. Critical selections and longer-lead items will also be identified early so the project is not waiting on decisions or materials that could have been addressed beforehand.

  4. Protected floors and contained work area with a wall opened for remodeling

    4. Protect and Open the Space

    We protect nearby floors and finished areas, establish work and debris paths, and contain the work area where needed before demolition starts. As existing materials come out, we can see framing, utilities, and the surfaces underneath. If demolition exposes a condition that changes the planned work, we document it and explain what it means before moving forward.

  5. New framing and utility rough-ins during residential remodeling

    5. We Build and Rough In

    We complete required framing and structural work, then coordinate the systems that need to go behind the finished surfaces. That can include plumbing lines, electrical wiring, HVAC or ventilation, and backing or support needed for cabinets, fixtures, and other installed components.

  6. Bathroom plumbing, wiring, and waterproof surfaces ready for inspection

    6. Check Before Closing

    Required rough inspections are completed before permitted work is concealed. We do not close those areas until the applicable work is ready to move forward. Then insulation, drywall, backer materials, and other surfaces can go in. In bathrooms and other wet areas, waterproofing and properly prepared surfaces come before tile and finish coverings.

  7. Cabinetry and interior finishes being installed in a remodeled room

    7. Install the Finishes

    We sequence cabinetry, countertops, tile, flooring, trim, paint, fixtures, and hardware so one stage does not unnecessarily damage work that is already complete. Fit, alignment, transitions, and how doors, drawers, fixtures, and finished surfaces come together matter just as much as the individual materials.

  8. Homeowner and remodeler testing cabinetry during the final walkthrough

    8. Test and Walk Through

    We check the completed components included in the remodel, including fixtures, doors, drawers, lighting, ventilation, and other operating elements. We complete applicable final inspections, address punch-list items, clean the work area, and walk the finished space with you.

Already Rebuilding? Improve Your Space Before It’s Put Back

Water or fire damage can force parts of your home to be removed before they can be rebuilt. If you already wanted to change that space, this is a good time to discuss those plans before the rebuild is finalized.

Home interior transitioning from reconstruction to improved finishes

Choose What You Want to Improve

A different layout, upgraded cabinetry, new finishes, added storage, or other changes beyond the loss are remodeling choices. Keeping those improvements separate from the insurance-related reconstruction scope makes it clear what belongs to the rebuild and what you are choosing to add.

Talk to PNW before the rebuild decisions are finalized so we can discuss what you want to change while the space is already being put back together.

Remodeling team reviewing plans inside an older Portland home

Remodeling Planned Around the Home You Have

We bring restoration and reconstruction experience into planned remodeling, so we look at more than how the finished space will look.

Condition-Aware Remodeling

Our restoration background helps us recognize moisture, damaged materials, previous repairs, and other existing conditions that could affect the remodel before new work goes in.

Reconstruction Experience

We already rebuild drywall, ceilings, flooring, cabinetry, finish carpentry, painting, and other interior components after property damage. That hands-on rebuild experience carries naturally into planned remodeling.

EPA Lead-Safe

Many Portland-area homes were built before 1978. PNW is EPA Lead-Safe certified for covered renovation work where lead-safe requirements apply.

IICRC-Certified Firm

PNW is an IICRC-Certified restoration firm, with an established background in professional property assessment, remediation, and restoration before spaces are rebuilt.

Portland-Based & Licensed

We are based in Portland, licensed and insured, and already work throughout the surrounding metro area, where many of the homes we remodel have their own age, construction history, and existing conditions.

Planning a remodel? Start with a team that understands both the finished space and what it takes to rebuild it right.

Portland neighborhood with craftsman homes and mature trees

Remodeling Across the Portland Metro

PNW serves homeowners and property owners throughout Portland and surrounding communities, including:

Portland, ORHillsboro, ORBeaverton, ORTigard, OROregon City, ORCanby, ORAloha, ORMilwaukie, ORGresham, OR

Don’t see your city listed? Call PNW and tell us where your property is. We’ll let you know whether your remodeling project falls within our service area.

Common Remodeling Questions & Answers

1. I want to remodel, but I do not have the whole design figured out. Is it too early to call?
No. You do not need every finish, fixture, or layout decision made before contacting us. Start with the room you want to change, what is not working now, and what you want the finished space to do better.
2. How do I know whether we should keep the current layout or change it?
Start with what is causing the problem. If the room works well but looks dated, keeping the layout may make sense. If storage, movement, fixture placement, or how rooms connect is the issue, changing the layout may be worth considering. Moving walls, plumbing, electrical, or mechanical systems can also make the project more involved.
3. How much does a kitchen, bathroom, basement, or whole-house remodel cost?
There is no useful single price based on the room alone. Size, layout changes, materials, existing conditions, permits, and how much construction is involved can all affect the project. We need to understand what you actually want to change before giving you a meaningful estimate.
4. What happens if you open a wall or floor and find a problem?
We do not simply cover it and continue. We identify what was uncovered, explain how it could affect the remodel, and discuss the next step with you before that area is closed back up.
5. Can an older Portland home be remodeled without losing its character?
Yes. Updating an older home does not automatically mean replacing everything that makes it special. The project can focus on improving function and worn or outdated areas while maintaining original features you want to preserve.
6. Will my remodel need permits?
It depends on the work, the property, and where it is located. In Portland, work such as moving or adding walls, creating habitable basement space, adding a bathroom, or changing plumbing, electrical, or mechanical systems can require permits and inspections. Requirements should be confirmed for the specific project and jurisdiction.
7. Can we stay in the house while the remodel is happening?
Sometimes. It depends on the size of the project, which rooms are affected, whether essential utilities need to be interrupted, and whether safe access through the home can be maintained. A secondary bathroom remodel may be much easier to live around than a kitchen or whole-house project. These disruptions should be understood before construction starts.
8. How long will the remodel take?
The timeline depends on the actual scope. Keeping the existing layout is different from moving walls, plumbing, or other systems. Permits, inspections, material lead times, existing conditions, and changes made during construction can also affect timing. We base the schedule on the project rather than giving every remodel the same timeline.
9. What if we want to change something after construction has started?
Tell us as early as possible. A change can affect materials already ordered, completed work, trade scheduling, cost, and the finish date. The change and its effect on the project should be documented before the additional work moves forward.
10. My kitchen or bathroom is already being rebuilt after water or fire damage. Can we remodel it at the same time?
If you want to change the layout, cabinetry, finishes, storage, or other parts of the space while it is being rebuilt, discuss those plans before the reconstruction scope is finalized. Insurance-related reconstruction and homeowner-selected remodeling should remain clearly separated.
Finished Portland home remodel with connected kitchen and living room

Start With What You Want to Change

You do not need every detail figured out before contacting PNW. Maybe the kitchen needs better flow, the bathroom needs easier access, the basement needs to become usable, or several rooms need to work together better.

Tell us what is not working now and what you want the space to do better. We can start there.

Call Us Today! (503) 352-5209